There are currently no pipelines.
To run a merge request pipeline, the jobs in the CI/CD configuration file must be configured to run in merge request pipelines.
Created by: ghost
Changed code to old style of SQL queries
Tested as much as I could and all tables in DBV seem to work and look right. Silent sms detection working and inserting in Eventlog.
BackupDB() RestoreDB() db tested and working.
Get OCID data with my own key(Entered Manually) working. (Not working with Drawer Menu to get OCID key) This problem is here before my PR.
Fixes #550 (closed)
To run a merge request pipeline, the jobs in the CI/CD configuration file must be configured to run in merge request pipelines.